8th Semester Major Project Phase II Review 1
The 8th semester major project phase II review 1 examination is scheduled from April 2, 2024, to April 12, 2024. The examination will be conducted in offline mode and will start from 9.00 AM onwards. The groups have been assigned a panel for evaluation (see the bottom of the page).
Project team members have to prepare a PPT of around 12 slides. The PPT content must be as follows:
1. Project Tile, Project Team ID, Guide Name and Student Details (First Slide)
2. Introduction and Problem Statement (Max 2 Slides)
3. Literature Survey (Max 2 Slides)
4. Objectives (1 Slide)
5. Project Work Carried Out (Max 5 Slides)
Work carried out may include architectural design of the project, implementation of any objectives, Data Sets, Data Collection, Data Pre-processing, pseudo code/ algorithms, discussion of the results, etc.
6. Status of the research paper (Max 1 Slide)
Note:
1. The request for a change in exam date will not be entertained. If any team member(s) has a placement drive (on campus), the entire team has to appear for the examination on reserved days for the assigned panel examiners.
2. Progress report 2 copy must be signed by project supervisor and HOD. For more details to prepare progress report go through this notice (https://csitgeu.in/wp/wp-content/uploads/2024/02/Major-Project-Progress-Report-2-Submission.htm)
3. Progress Report hard copies must be submitted to the examiners on the day of major project phase II review 1 examination.
4. A major project phase II review 1 examination will not be conducted for the students without the submission of hard copy of the progress report in the specified format, duly signed by the project supervisor and HoD.
5. For NOC students major project phase II review 1 examination will be schedule later
|
|
Panel 1
|
Panel 2
|
Panel 3
|
Panel 4
|
Panel 5
|
|
2/04/2024 (Tuesday) |
MP23CSE001 to MP23CSE012 |
MP23CSE061 to MP23CSE072 |
MP23CSE121 to MP23CSE132 |
MP23CSE181 to MP23CSE187 MP23CE001 To MP23CE005 |
MP23CST025 To MP23CST036 |
|
3/04/2024 (Wednesday) |
MP23CSE013 to MP23CSE024 |
MP23CSE073 to MP23CSE084 |
MP23CSE133 to MP23CSE144 |
MP23CE006 To MP23CE017 |
MP23CST037 To MP23CST043 MP23DS001 To MP23DS004 |
|
4/04/2024 (Thursday) |
MP23CSE025 to MP23CSE036 |
MP23CSE085 to MP23CSE096 |
MP23CSE145 to MP23CSE156 |
MP23CE018 To MP23CE028 |
MP23DS005 To MP23DS016 |
|
5/04/2024 (Friday) |
MP23CSE037 to MP23CSE048 |
MP23CSE097 to MP23CSE108 |
MP23CSE157 to MP23CSE168 |
MP23CST001 To MP23CST012 |
MP23DS017 To MP23DS021 |
|
8/04/2024 (Monday) |
MP23CSE049 to MP23CSE060 |
MP23CSE109 to MP23CSE120 |
MP23CSE169 to MP23CSE180 |
MP23CST013 To MP23CST024 |
RESERVED |
|
10/04/2024 (Wednesday) |
RESERVED |
RESERVED |
RESERVED |
RESERVED |
RESERVED |
|
12/04/2024 (Thursday) |
RESERVED |
RESERVED |
RESERVED |
RESERVED |
RESERVED |