Link For Registration affidavit even Sem 2018
Year: 2017
EXTERNAL PRACTICAL EXAM (2017-18) 3,5 and 7
Click For Details 3rd Sem EXTERNAL PRACTICAL EXAM TIME TABLE 5th Sem EXTERNAL PRACTICAL EXAM TIME TABLE 7th Sem EXTERNAL PRACTICAL EXAM TIME TABLE
Google Internship 2018(Today Last Date)
Pre-Final Year Students can apply for the internship by Today Link https://internshala.com/google_internships?utm_source=tnp_google&utm_medium=reminder
Debarred List Lab 5 CS, BDA CC
5th Semester Debarred List 5 CS Roll No. Name PCS502 PCS 503 PCS505 2010326 Ayush Saini D D D 2010337 Devesh Singh D D D 2010276 Aditya Kaptiyal D D D 2010457 Rishav Dev D D D 5 CS CC Roll No. Name PCS 502 PCS 503 PCS 505 2010631…
Debarred List Lab 3 CS, BDA CC
3rd Semester Debarred List 3- CS Roll No. Name PCS 301 PCS302 PCS303 2011492 SARVAGYA MAHESHWARI D D 2011354 Chaitanya Bhardwaj D D D 2011341 Avinash Kumar D D 2011565 Vishesh Mittal D 2011273 Akarsh bhatt D D 2011446 Pranav Painuly D D 2011362 ASTHA SINGH D 2011259 ABHINAV…
Microsoft Imagine Cup Competition
All students of CS/IT can join the Microsoft Imagine Cup Competition hosted by Graphic Era University on 22 and 23 December 2017.
5th Semester Debarred List 2017
5th Semester Debarred List 2017 (Click) Note: Laboratory Debarred List will be intimated soon.
3rd Semester Debarred List 2017
3rd Semester Debarred List 2017 (Click) Note: Laboratory Debarred List will be intimated soon.
Notice: Presentation of Project phase-I 7th Sem
The following Students are required to complete their presentation of Project phase-I on 17/11/2017 between 2 PM to 5 PM. Otherwise these students will be marked as absent. SN Roll No. En. No. Name of Students Fat_Int 2 2008076 GE-14208076 NEERAJ SHARMA GOPAL SHARMA 18 2008558 GE14208558 ABHISHEK PARMAR RAJ…
Notice : Evaluation of Mini Project of 5th Sem B.Tech, CSE (CC)
“You need to carry out the following: (Line 27-36, Mini Project 5th Sem CC -1) 1. Ideate a solution to a sector (from the above given sectors) specific problem. {Problem Statement} 2. Use or Design Datasets or collect live data for the solution. 3. Mine the datasets, Code and deploy the solution (service) on-premise…