All students having back in lab exams are required to appear for the exam as detailed below. Wherever a faculty name is specified the students are required to contact the faculty member within the stipulated days. Students failing to appear in the exams within the due dates will be marked ABSENT and no subsequent chances will be given.
| Lab Name | Concerned Faculty Member | Due Date |
| All Even Semester Lab Exams (4th and 6th) | Back exams should be given with the regular students. See the current external lab exam schedule and appear with any of the batches as per the schedule. No separate lab exams for the back students will be conducted. | As per the regular exam schedule. |
| Logic Design (3rd Sem) | Hemant Pokhriya | 13-14 May, 2019 |
| Unix and Shell Programming (3rd Sem) | Sanjeev Kukreti | 14-15 May, 2019 |
| Data Structure Back(3rd and 4th Sem) | Upendar Aswal | 15-16 May, 2019 |
| OOPS with C++ (3rdSem) | Kireet Joshi | 14-15 May, 2019 |
| Java Prog Lab 6th Sem | Sanjeev Kukreti | 14-15 May, 2019 |
| Bigdata Storage and Processing Lab(5th Sem) | Vijay Singh | 15-16 May, 2019 |
| Design and Analysis of Algorithms Lab (5thSem) | Prabhjot Singh | 15-16 May, 2019 |
| DBMS Lab(5th Sem) | Parul Madan | 15-16 May, 2019 |
| Operating SYstens Lab (5th Sem) | Dr Vikas Tripathi | 13-14 May, 2019 |
| OOAD and CN Lab (7thSem) | Sumit Pundir | 14-15 May, 2019 |
| ACA & AI Lab(7th Sem) | Akanksha Gupta | 14-15 May, 2019 |
| Seminar on Industrial Interaction (7th Sem) | Ankur Choudhary | 14-15 May, 2019 |
| Mini Projects Backs (CSE and IT) | Dr Rahul Nijhawan | 14-16 May, 2019 |
| Mini Projects Backs (Cloud) | Dr Preeti Mishra | 14-16 May, 2019 |
| Mini Projects Backs (BDA) | Vijay Singh | 14-16 May, 2019 |
| Cloud Computing Lab 4th Sem | piyush Agarwal | 16 May, 2019 |
addition to back lab exam
- Python Programming Lab(4th Sem IT) – Deepak Uniyal – 15 and 16 May
- Mobile Computing and OOAD Lab (7th Sem IT) – Dr Ankur Choudhary – 15 and 16 May
- CN and Cryptography Lab (7th Sem IT) – Dr Santosh Kumar – 15 and 16 May
*Schedule of CBNST Lab will be displayed later
*Major Project Backs will be held with 8thsem External Viva tentatively scheduled between 20-22 May, 2019. Students are advised to check the website for final dates.
