{"id":5698,"date":"2026-04-06T23:14:27","date_gmt":"2026-04-06T17:44:27","guid":{"rendered":"https:\/\/csitgeu.in\/wp\/?p=5698"},"modified":"2026-04-06T23:14:27","modified_gmt":"2026-04-06T17:44:27","slug":"pbl-phase-2-evaluation-schedule-4th-6th-semester","status":"publish","type":"post","link":"https:\/\/csitgeu.in\/wp\/2026\/04\/06\/pbl-phase-2-evaluation-schedule-4th-6th-semester\/","title":{"rendered":"PBL Phase\u20132 Evaluation Schedule (4th &#038; 6th Semester)"},"content":{"rendered":"<p><strong>NOTICE<\/strong><\/p>\n<p><strong>Ref no.: GEU\/CSE\/PBL4\/26-E <\/strong>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <strong>Date: 06-04-2026<\/strong><\/p>\n<p>Subject: PBL Phase\u20132 Evaluation Schedule (4th &amp; 6th Semester)<\/p>\n<p>All students of the 4th and 6th Semesters are hereby informed that the PBL Phase\u20132 Evaluation will be conducted on:<\/p>\n<p><strong>10th April 2026 (Friday)<\/strong><\/p>\n<p>The detailed evaluation schedule is attached below.<\/p>\n<p><strong>Important Instructions<\/strong><\/p>\n<ul>\n<li>The Phase\u20132 report must be uploaded on LMS and approved by the respective mentor before the presentation.<\/li>\n<li>Students must carry a screenshot of the LMS approval during the evaluation.<\/li>\n<li>Students must also bring the Faculty\u2013Team Interaction Table (duly filled and signed by the mentor).<\/li>\n<li>All team members must be present for the evaluation.<\/li>\n<li>Students must report strictly as per the attached schedule, in proper university uniform with a valid ID card.<\/li>\n<\/ul>\n<p>Failure to upload and obtain mentor approval on LMS before the evaluation may result in non-evaluation.<\/p>\n<p>Students are advised to complete all formalities in advance and coordinate regularly with their respective mentors.<\/p>\n<ul>\n<li><a href=\"http:\/\/csitgeu.in\/wp\/wp-content\/uploads\/2026\/04\/Evaluator_IV_DAA_Phase2.xlsx\">Evaluator_IV_DAA_Phase2<\/a><\/li>\n<li><a href=\"http:\/\/csitgeu.in\/wp\/wp-content\/uploads\/2026\/04\/Evaluator_IV_DL_Phase2.xlsx\">Evaluator_IV_DL_Phase2<\/a><\/li>\n<li><a href=\"http:\/\/csitgeu.in\/wp\/wp-content\/uploads\/2026\/04\/Evaluator_IV_Java_Phase2.xlsx\">Evaluator_IV_Java_Phase2<\/a><\/li>\n<li><a href=\"http:\/\/csitgeu.in\/wp\/wp-content\/uploads\/2026\/04\/Evaluator_VI_CD_Phase_2.xlsx\">Evaluator_VI_CD_Phase_2<\/a><\/li>\n<li><a href=\"http:\/\/csitgeu.in\/wp\/wp-content\/uploads\/2026\/04\/Evaluator_VI_FL_Phase2.xlsx\">Evaluator_VI_FL_Phase2<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>NOTICE Ref no.: GEU\/CSE\/PBL4\/26-E \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Date: 06-04-2026 Subject: PBL Phase\u20132 Evaluation Schedule (4th &amp; 6th Semester) All students of the 4th and 6th Semesters are hereby informed that the PBL Phase\u20132 Evaluation will be conducted on: 10th April 2026 (Friday) The detailed evaluation schedule is attached below. Important Instructions The&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_crdt_document":"","pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"categories":[10],"tags":[],"class_list":["post-5698","post","type-post","status-publish","format-standard","hentry","category-latest"],"_links":{"self":[{"href":"https:\/\/csitgeu.in\/wp\/wp-json\/wp\/v2\/posts\/5698","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csitgeu.in\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csitgeu.in\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csitgeu.in\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/csitgeu.in\/wp\/wp-json\/wp\/v2\/comments?post=5698"}],"version-history":[{"count":1,"href":"https:\/\/csitgeu.in\/wp\/wp-json\/wp\/v2\/posts\/5698\/revisions"}],"predecessor-version":[{"id":5704,"href":"https:\/\/csitgeu.in\/wp\/wp-json\/wp\/v2\/posts\/5698\/revisions\/5704"}],"wp:attachment":[{"href":"https:\/\/csitgeu.in\/wp\/wp-json\/wp\/v2\/media?parent=5698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csitgeu.in\/wp\/wp-json\/wp\/v2\/categories?post=5698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csitgeu.in\/wp\/wp-json\/wp\/v2\/tags?post=5698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}