Skip to content
Department of CSE Department of CSE

Graphic Era deemed to be University Dehradun

  • Home
  • Vision and Mission
  • Timetables
  • Contact us
  • Disclaimer
  • Feedback
  • Research
  • PO, PSO and PEO
Department of CSE
Department of CSE

Graphic Era deemed to be University Dehradun

Notice: 7th Sem Major Project Phase-I Evaluation Notice

admin, December 7, 2020

Notice: 7th Sem Major Project Phase-I Evaluation Notice

All 7th Semester students are notified of submission of Major Project Phase-I evaluation. Due to prevailing situation the evaluation will be done in online mode. The evaluation is for 100 marks.

Phase-I evaluation consist of submitting a professional standard Design Document/SRS. Though there is no specified format you are expected to adhere to best practices. You can also use standard templates for the report preparation.

Based on the nature of the project your report may contain the following (it is a suggested outline only, consult your supervisor for guidance):

  1. Front Page (Sample front page: http://csitgeu.in/wp/samplefrontpage.pdf )
  2. Problem Summary, Aims and Objectives
  3. Detailed description of the problem with facts and figures
  4. Literature Review
  5. Methodology to be adopted
  6. UML Diagrams detailing class relations, E-R Diagram, Database Schema etc. wherever applicable
  7. Expected Outcome
  8. References

Note: There is no minimum or maximum prescribed number of pages

List of students/groups and their project title is available here: http://csitgeu.in/wp/projectlist2020.xlsx

If you have not submitted the details as per previous notice you can still submit the report, but marks will be deducted.

Changes in project title is permitted with consultation with your guide, you do not send any application for that. However, the title in the report should be the final one.

If project is done is groups it should be ensured that only one report is submitted, do not submit multiple copies.

You should prepare your report to the satisfaction of your supervisor. The final copy of your report should also be available with your supervisor as he/she will need to provide the supervisor part of marks in subsequent phases.

How to Submit:

  1. Prepare the report. The report should be either in docx format or pdf format.
  2. Naming of the Report (Very Important): Please refer to the project list. There is a column: Project Number. Your file name should be strictly ProjectNumber.docx/pdf (for example of your group’s ProjectNumber is 2, the file name should be 2.docx or 2.pdf. Failure to adhere to naming conventions will result in rejection.
  3. If you have not submitted the details earlier your report name should be your univrollno.docx/pdf. If it is done in groups all the roll nos should be separated by an underscore (for example 2011200.pdf, 2011201_2011255_2016122.pdf etc)
  4. Submit the report in the following: https://forms.gle/XbJ61Bs6ckYDAxqR9

The due date for Project Phase-I Report submission is Thursday, 17 Dec, 2020, 5 PM. The submission link will be immediately closed after the due date and time.

 

Latest

Post navigation

Previous post
Next post

Related Posts

End Term Back Lab Schedule Jan 2020

January 8, 2020

Lab Name and Code Date and Time Concern Faculty Member Web Technology Lab (PIT303) 14/01/2020 9 AM Mr. Manish Sharma Unix and Shell Programming Lab(PCS303) 13/01/2020 9 AM Mr. Sanjeev Kukreti Mini Project (SIT301 and CSP301) 15/01/2020 9AM Dr. Vijay Singh CBNST Lab(PMA402) 13/01/2020 9 AM Mr. Ankur Chaudhary &…

Read More

Mid Term Practical Exam Schedule (B. Tech. V Semester)

September 22, 2021

Mid Term Practical Exam Schedule (For B. Tech. V Semester)

Read More

6TH AND 8TH SEM STUDENTS: SUBMISSION OF GATE/OTHER COMPETITIVE EXAM SCORECARD-2025

March 19, 2025March 19, 2025

All 6th and 8th semester students who appeared for GATE 2025 or other competitive exams like CAT/MAT etc. are required to submit a copy of their score card at the following link irrespective of their score. Submission should be done by Wednesday 26th March, 2:00 PM without fail. Failure to do so will…

Read More

New Notices

  • Hands-on Workshop on Internet of Things (IoT) October 13, 2026
  • PBL Phase-II Evaluation – 19th October 2026 October 10, 2026
  • Mid Semester Back Practical Examination October 2026 October 1, 2026
  • 7TH SEMESTER MAJOR PROJECT SYNOPSIS APPROVAL SCHEDULE FOR ABSENTEES AND REJECTED LIST September 30, 2026
  • ABSENTEES AND REJECTED LIST -7TH SEMESTER MAJOR PROJECT SYNOPSIS APPROVAL HELD ON SEPTEMBER 14TH & 15TH 2026 September 28, 2026
  • End Semester Practical Examination September 2026 (Internship Students) September 15, 2026
  • 7th SEMESTER MAJOR PROJECT SYNOPSIS APPROVAL DETAILED SCHEDULE September 9, 2026
  • PBL Phase-I Evaluation – Schedule & Instructions September 5, 2026
  • 7th SEMESTER MAJOR PROJECT SYNOPSIS APPROVAL SCHEDULE September 4, 2026
  • Agentic AI: From Generative Models to Autonomous Agents (TWS-26) September 3, 2026

All Old Notices

Student Area
December 2020
M T W T F S S
 123456
78910111213
14151617181920
21222324252627
28293031  
« Nov   Jan »
©2026 Department of CSE | WordPress Theme by SuperbThemes